Key English Slovenian
taskArrivalTimeNavbox Task ETA ETA naloge
taskArrivalTimeNavboxDescription Estimated time of arrival (ETA) at the end of the task Ocenjena ura prihoda v lokalnem času (ETA) ob prihodu na cilj naloge
taskAverageVarioNavbox Task Avg. Vario Povp.Vario naloge
taskAverageVarioNavboxDescription Average achieved climb since the start of the task Povprečno dviganje doseženo od začetka naloge
taskDeltaTimeNavbox Task ∆time ∆čas Naloge
taskDeltaTimeNavboxDescription Task ETE minus Task remaining time. A negative value means that you will arrive too early to the AAT finish ETE naloge minus Preostali čas za nalogo. Negativna vrednost pomeni prehitro vrnitev na cilj AAT naloge
taskEstimatedTimeNavbox Task ETE ETE naloge
taskEstimatedTimeNavboxDescription Estimated time en route (ETE) until task is completed Ocenjen potreben čas (ETE) za dokončanje naloge
taskPercentageFlownNavbox Task % flown Odleten % naloge
taskPercentageFlownNavboxDescription Task percentage flown Odstotek razdalje po nalogi, ki si jo že opravil
taskRemainingDistanceNavbox Task Distance Dolžina naloge
taskRemainingDistanceNavboxDescription Remaining distance of the task to the goal Preostala razdalja do cilja naloge
taskRemainingTimeNavbox Task Remaining Time Čas za nalogo
taskRemainingTimeNavboxDescription Time remaining to complete assigned area task (AAT) in designated task time Preostali čas za dokončanje AAT naloge
taskRequiredGlideRatioNavbox Task Required L/D Potrebna finesa za cilj
taskRequiredGlideRatioNavboxDescription Required glide ratio to reach the goal including safety margin and finish elevation Potreben drsni kot (finesa), da lahko dokončaš nalogo. Vsebuje vrednost za rezervo višine in višino cilja
taskRequiredSpeedNavbox Task Required Speed Hitrost za nalogo
taskRequiredSpeedNavboxDescription Required average speed over ground to complete assigned area task (AAT) on time Potrebna hitrost, da bi bila naloga zaključena ob zadanem času za AAT nalogo
taskSpeedNavbox Task Speed Hitrost naloge
taskSpeedNavboxDescription Speed on the task since the start time or the beginning of the route optimization Dosežena hitrost na nalogi id prečkanja štartne linije ali od začetka optimizacije